Demolition contractors working on residential sites in New Zealand are bound by a comprehensive set of health and safety obligations under the Health and Safety at Work Act 2015 (HSWA) and associated regulations. Whether it's a full house demolition or a partial strip-out, these rules exist to protect workers, neighbours, and the public — and as a homeowner, understanding them helps you choose the right contractor and know what to expect.
The Health and Safety at Work Act 2015
The HSWA is the cornerstone of workplace safety in New Zealand. Under this Act, demolition contractors are classified as a Person Conducting a Business or Undertaking (PCBU). This means they have a primary duty of care to ensure, so far as is reasonably practicable, the health and safety of their workers and anyone else who could be affected by their work — including you, your neighbours, and any passers-by.
WorkSafe NZ is the regulator that enforces these obligations and provides guidance on how to comply. They can inspect sites, issue improvement notices, and prosecute contractors who fail to meet their duties.
Notifiable Work and Site Notifications
Demolition is classified as notifiable work under the Health and Safety at Work (General Risk and Workplace Management) Regulations 2016 when it involves the demolition of a load-bearing element of a structure. This means the contractor must notify WorkSafe before work begins. As a homeowner, you should ask your contractor to confirm they have lodged this notification — it's a legal requirement, not optional.
Hazardous Substances: Asbestos Is the Big One
One of the most critical obligations on any residential demolition site is managing asbestos-containing materials (ACM). Homes built before 1990 — and sometimes later — may contain asbestos in roofing, wall cladding, floor tiles, pipe lagging, and textured ceilings.
Under the Health and Safety at Work (Asbestos) Regulations 2016:
- An asbestos survey must be carried out before demolition begins.
- Class A asbestos removal (friable asbestos) must only be performed by a licensed asbestos removalist.
- Class B asbestos removal (non-friable, bonded asbestos) also requires a licensed removalist for amounts over 10 square metres.
- An asbestos removal control plan must be in place.
- WorkSafe must be notified before licensed asbestos removal work starts.
Always ask your demolition contractor for evidence of their asbestos licence and their survey results. Never allow work to proceed on a pre-1990 home without this step being completed first.
Other Hazardous Materials
Beyond asbestos, contractors must identify and safely manage other hazardous materials commonly found in older NZ homes, including:
- Lead-based paint (common in homes built before 1980)
- Synthetic mineral fibres (insulation)
- Contaminated soil (especially on former industrial or agricultural land)
Proper containment, disposal, and worker protection measures are required for all of these.
Site Safety Requirements
A well-run demolition site will have visible safety measures in place. Under HSWA and associated regulations, contractors must:
- Establish a safe work method statement (SWMS) for high-risk construction work.
- Erect appropriate site fencing and barriers to prevent unauthorised access.
- Ensure workers have and use correct personal protective equipment (PPE).
- Manage falling objects, dust, and noise to protect neighbours and the public.
- Disconnect or make safe all services (electricity, gas, water) before demolition begins — this involves licensed electricians and gasfitters.
Restricted and Licensed Work
Some tasks connected to demolition are legally restricted to licensed tradespeople:
- Electrical disconnection must be carried out by a registered electrician (see EWRB).
- Gas disconnection must be done by a licensed gasfitter (see PGDB).
- Plumbing and drainlaying disconnections require a licensed plumber or drainlayer.
A reputable demolition contractor will coordinate these disconnections before any structural work begins.
Building Consents and Council Requirements
Demolition may require a building consent from your local council, depending on the scope of work. Some minor demolition may fall under Schedule 1 exemptions of the Building Act 2004, but you should always confirm with your council before assuming consent isn't needed. MBIE Building Performance has guidance on when consents apply.
What Homeowners Can and Cannot Do
As a homeowner, you are also considered a PCBU if you engage contractors — meaning you have duties too. These include:
- Choosing a contractor who can demonstrate compliance with WorkSafe obligations.
- Not directing workers to do unsafe work.
- Ensuring the site is reasonably safe for contractors to access.
You should not attempt to demolish structural elements, remove asbestos, or disconnect services yourself. These tasks carry serious legal and safety risks.
When to Call a Professional
Always engage a qualified, experienced demolition contractor for any residential demolition work. A good contractor will handle WorkSafe notifications, asbestos surveys, hazardous material removal, and service disconnections as part of their scope. Ask to see their health and safety plan, proof of insurance, and any relevant licences before signing a contract. You can find qualified local demolition contractors on tradedirectory.co.nz.


SiteWise