A site-specific safety plan outlines how hazards will be managed on your demolition site. Here's when you need one in NZ and what it covers.

What Is a Site-Specific Safety Plan and Do I Need One for Demolition?

A site-specific safety plan (SSSP) is a written document that identifies the hazards present on a particular worksite and explains exactly how those hazards will be controlled. For demolition work in New Zealand, having a solid SSSP isn't just good practice — in many cases it's a legal requirement under the Health and Safety at Work Act 2015 (HSWA).

What Is a Site-Specific Safety Plan?

Unlike a generic company health and safety policy, an SSSP is tailored to the unique conditions of one specific job. It covers the actual hazards on your property — things like the building's age, construction materials, site access, neighbouring properties, and the sequence of demolition work planned.

A well-prepared SSSP typically includes:

  • Site details — address, site layout, and a description of the structure to be demolished
  • Hazard identification — a thorough list of risks such as asbestos, lead paint, structural instability, underground services, and falling debris
  • Control measures — how each hazard will be eliminated or minimised
  • Emergency procedures — what to do if something goes wrong, including evacuation routes and emergency contacts
  • Roles and responsibilities — who is in charge of safety on site
  • Subcontractor management — how other trades working on site will be managed
  • Notifiable work details — if the project triggers notification requirements to WorkSafe NZ

When Is an SSSP Required for Demolition?

In New Zealand, demolition is classified as high-risk construction work under the Health and Safety at Work (General Risk and Workplace Management) Regulations 2016. This means a Health and Safety Plan must be prepared before work begins whenever the project involves:

  • Demolition of a structure that is load-bearing or otherwise related to the physical integrity of the building
  • Work where there is a risk of a person falling more than 3 metres
  • Work involving hazardous substances such as asbestos or lead
  • Any notifiable work — generally projects lasting more than 30 working days with more than 20 workers simultaneously, or exceeding 500 person-days of work

For most residential demolitions — even knocking down a single garage or sleepout — a contractor should still prepare an SSSP as a matter of professional practice and legal duty of care, even if formal notification to WorkSafe isn't triggered.

Asbestos: A Critical Part of Any Demolition Safety Plan

If your home was built before the mid-1980s, there is a real chance it contains asbestos-containing materials (ACMs). Under the Health and Safety at Work (Asbestos) Regulations 2016, an asbestos survey must be completed before any demolition begins, and the findings must be incorporated into the SSSP.

Removal of friable (crumbly) asbestos must be carried out by a Class A licensed asbestos removalist, and WorkSafe must be notified at least five working days before that work starts. This is non-negotiable — asbestos exposure is one of the leading causes of work-related death in New Zealand. Check WorkSafe NZ's guidance on asbestos for the full requirements.

Building Consents and Your Safety Plan

Demolition often requires a building consent from your local council. While the SSSP is a health and safety document rather than a building consent document, councils may ask to see evidence that hazardous materials have been identified and managed before they issue consent. Always check with your council early — consent requirements vary depending on the size and type of structure. MBIE Building Performance has useful guidance on when consents are required and what Schedule 1 exemptions may apply.

Who Prepares the Safety Plan?

The principal contractor (the main demolition contractor you hire) is legally responsible for preparing and implementing the SSSP. As a homeowner acting as your own project manager, you may technically take on the role of principal contractor — which means the legal responsibility for the SSSP could fall on you. This is one of the strongest reasons to engage a qualified demolition contractor rather than managing the project yourself.

A reputable contractor will:

  • Conduct a pre-demolition survey
  • Prepare the SSSP before any work starts
  • Brief all workers and subcontractors on its contents
  • Keep the plan updated if site conditions change

What Happens If There Is No Safety Plan?

Working without an SSSP when one is required is a breach of the HSWA and can result in significant fines for both the contractor and the person conducting a business or undertaking (PCBU) — which can include you as the homeowner if you directed the work. More importantly, the absence of a safety plan dramatically increases the risk of serious injury or death on site.

When to Call a Professional

Demolition is inherently dangerous work. Even small jobs can involve structural collapse risk, hidden services (gas, electrical, plumbing), and hazardous materials. You should always engage a qualified demolition contractor who:

  • Holds appropriate public liability and professional indemnity insurance
  • Has experience preparing SSSPs and managing demolition hazards
  • Understands their obligations under the HSWA and relevant regulations
  • Is familiar with Licensed Building Practitioners requirements where restricted building work is involved

You can find experienced, vetted demolition contractors in your area on tradedirectory.co.nz.

Frequently Asked Questions

Does a homeowner need to prepare a site-specific safety plan for demolition?+

If you hire a demolition contractor, they are responsible for preparing the SSSP as the principal contractor. However, if you take on the role of project manager yourself, legal responsibility may shift to you. It's strongly recommended to engage a qualified contractor to handle this.

Is demolition work in NZ notifiable to WorkSafe?+

Not all demolition is notifiable. Work becomes notifiable when it exceeds 30 working days with more than 20 simultaneous workers, or 500 person-days total. However, asbestos removal work has its own separate notification requirements — at least five working days' notice to WorkSafe before friable asbestos removal begins.

Do I need a building consent before demolishing a structure?+

It depends on the size and type of structure. Many demolitions require a building consent, but some smaller structures may be exempt under Schedule 1 of the Building Act 2004. Always check with your local council before starting any demolition work.

What happens if asbestos is found during demolition?+

Work must stop in the affected area immediately. A licensed asbestos assessor should be engaged to confirm the extent of the ACMs, and a licensed asbestos removalist must carry out the removal. This process must be documented in the SSSP and, for friable asbestos, WorkSafe must be notified in advance.

Can I demolish a small shed or garage myself without a safety plan?+

Even for small DIY demolition, you still have a duty of care under the Health and Safety at Work Act 2015. While a formal SSSP may not be legally mandated for very minor work, you should still identify hazards (especially asbestos and underground services) before starting. When in doubt, consult a professional demolition contractor.

Need a Demolition Contractor?

Find qualified demolition contractors near you in our directory.

Find a Demolition Contractor →

Demolition Contractors Near You

Canterbury Demolition AND Earthmoving Ltd logo

Demolition Contractor

4.8(17)

Christchurch, Canterbury

Canterbury Demolition and Earthmoving Ltd is a demolition contractor based in Christchurch, Canterbury. They provide demolition and excavation services for both residential and commercial buildings.

  • SiteWise
Morecroft logo

Demolition Contractor

Whangarei, Northland

Morecroft is New Zealand's largest provider of asbestos removal, hazardous materials management, asbestos testing, demolition and occupational hygiene services.

  • SiteWise
  • Tōtika Prequalified
  • ISO 45001
Alpha Demolition Ltd logo

Demolition Contractor

Auckland, Auckland

Alpha Demolition Ltd is a demolition contractor based in Auckland, specialising in building demolition, asbestos project management, asbestos removal, and dry ice blasting. They serve residential, commercial, and government clients across New Zealand.

Ambient Civil Ltd logo

Demolition Contractor

Auckland, Auckland

Civil Construction Auckland | Ambient Civil & Drainage NZ [ AC ] - Civil & Drainage 36 50 S - Auckland, NZ Local time --:-- Auckland's Civil Construction & Earthworks Experts Auckland Cover $5M insured Experience 20+ years Area Auckland-wide Compliance NZ H&S Get a free quote -> See our work Scroll Civil & Drainage Auckland NZ Free quotes / 24hr reply $5M Public Liability NZ H&S compliant 20+ years on the tools Privately owned Civil & Drainage Auckland NZ Free quotes / 24hr reply $5M Public...

  • SiteWise
Care Demolition Services logo

Demolition Contractor

Auckland, Auckland

CARE NZ - CARE ASBESTOS REMOVAL CARE NZ We are a -knit team of experienced asbestos professionals based in West Auckland, with 10 years of removal experience. We ve work for and alongside other removal groups over the years, and we ve practically seen it all. We have a range of professional contacts in various areas of both removal, testing, demolition and construction which allows us to tackle any problem. Our Supervisor s hold both Class A and B removal...

Central Demolition logo

Demolition Contractor

Feilding, Manawatū-Whanganui

Central Demolition provide specialist commercial and residential demolition and asbestos removal services throughout the North Island.

Last updated: Last reviewed:

The information on this page is provided as a general guide only. Kiwi Trade Directory makes no representations or warranties regarding the accuracy, completeness, or suitability of this information for your specific situation. Costs, timeframes, and recommendations vary significantly depending on your location, property, and individual circumstances. Always obtain multiple quotes from qualified tradespeople and seek independent professional advice before undertaking any home improvement or building work. Kiwi Trade Directory accepts no liability for any loss or damage arising from reliance on the information provided on this site.