Skip to main content
See the latest posts from tradesmen around the country
Knowledge BaseDemolition Contractor

What Happens to Services Like Gas and Power Before Demolition Begins?

Before any demolition starts, all utilities including gas, electricity, water and telecoms must be safely disconnected by licensed professionals.

What Happens to Services Like Gas and Power Before Demolition Begins?

Before a single wall comes down, every utility service connected to a building must be properly isolated or permanently disconnected. This is not just good practice — in New Zealand it is a legal and safety requirement. Getting the sequencing right protects workers, neighbours, and the wider network infrastructure.

Why Disconnecting Services First Is Non-Negotiable

Demolition exposes pipes, cables and fittings that are normally hidden inside walls and under floors. If live services are still connected when a structure is being broken apart, the risks include electrocution, gas explosions, flooding, and damage to public infrastructure. WorkSafe NZ sets out clear obligations for managing these hazards on demolition sites, and your demolition contractor is required to have a documented hazard management plan before work begins.

Electricity Disconnection

Electrical disconnection is restricted work and must be carried out by a registered electrician. The process typically involves:

  • Contacting your lines company (e.g. Vector, Unison, Orion, or your local network operator) to arrange disconnection at the street or pole
  • Having a registered electrician remove the meter and isolate the internal wiring
  • Obtaining a Certificate of Compliance (CoC) for any electrical work completed

The Electrical Workers Registration Board (EWRB) maintains the register of licensed electricians in New Zealand. Never attempt to disconnect mains electricity yourself — it is illegal and extremely dangerous.

Gas Disconnection

Natural gas and LPG connections must be disconnected by a licensed gasfitter registered with the Plumbers, Gasfitters and Drainlayers Board (PGDB). Gas disconnection work includes:

  • Notifying your gas retailer or network operator (e.g. First Gas) to shut off supply at the meter
  • A licensed gasfitter capping or removing internal pipework
  • Arranging for the gas meter to be uplifted by the network company

This work cannot be done by a homeowner or a general builder. Attempting to interfere with gas fittings without a licence is illegal under the Plumbers, Gasfitters, and Drainlayers Act 2006.

Water and Wastewater

Water supply and drainage connections also need to be dealt with before demolition:

  • Water toby (toby valve): Your local council or water authority can shut off supply at the street toby. Internal plumbing disconnection is restricted work and must be done by a registered plumber.
  • Wastewater and stormwater drains: Drain connections to the public network must be capped at the boundary. This is drainlaying work and must be carried out by a licensed drainlayer registered with the PGDB.
  • Your council may require inspection of the capped connections before demolition proceeds.

Telecommunications and Other Services

Telecommunications lines (phone, fibre, cable internet) are generally not as immediately dangerous as power or gas, but they still need to be disconnected:

  • Contact your provider (Chorus, Enable, Tuatahi First Fibre, etc.) well in advance — lead times can be several weeks
  • Chorus and other network operators have their own processes for decommissioning connections
  • Sky TV dishes and aerial cables should also be removed

The Correct Order of Disconnection

A good demolition contractor will coordinate the disconnection sequence for you. As a general guide:

ServiceWho Does ItTypical Lead Time
ElectricityLines company + registered electrician1–4 weeks
GasGas network + licensed gasfitter1–3 weeks
Water/wastewaterCouncil/water authority + registered plumber/drainlayer1–3 weeks
TelecommunicationsYour provider (Chorus, etc.)2–6 weeks

Always allow plenty of time — network operators can be slow to respond, and demolition cannot legally begin until all services are confirmed as isolated.

Building Consents and Notifications

Demolition of most structures in New Zealand requires a building consent, though some minor structures may be exempt under Schedule 1 of the Building Act 2004. Always check with your local council before assuming consent is not needed. MBIE Building Performance has guidance on when consents are required. Your council may also require notification to neighbouring properties and a demolition management plan.

Asbestos is another critical consideration for older buildings — any asbestos-containing materials must be identified and managed by a licensed asbestos removalist before demolition, as required under the Health and Safety at Work (Asbestos) Regulations 2016. WorkSafe NZ has detailed guidance on this.

When to Call a Professional

Virtually all service disconnection work ahead of demolition must be done by licensed professionals — this is not a DIY area. A reputable demolition contractor will typically manage the coordination of these disconnections on your behalf, but it pays to understand what is involved so you can ask the right questions. If you need to find a qualified demolition contractor or tradesperson in your area, you can search tradedirectory.co.nz for local professionals.

Frequently Asked Questions

Can I disconnect my own power or gas before demolition?+

No. Electrical and gas disconnection are legally restricted work in New Zealand. Electricity must be disconnected by a registered electrician and the lines company, while gas must be handled by a licensed gasfitter registered with the PGDB. Attempting this yourself is illegal and dangerous.

How far in advance should I arrange service disconnections?+

Allow at least four to six weeks before your planned demolition date. Network operators like electricity lines companies and Chorus can have long lead times, and all services must be confirmed as disconnected before demolition work can legally begin.

Do I need a building consent to demolish a house in New Zealand?+

In most cases, yes. Demolition of a house or substantial structure typically requires a building consent from your local council. Some minor structures may be exempt under Schedule 1 of the Building Act 2004, but you should always confirm with your council before proceeding. MBIE Building Performance at building.govt.nz has further guidance.

What happens if asbestos is found before demolition?+

If your building was constructed before the mid-1990s, it may contain asbestos-containing materials. An asbestos survey must be carried out before demolition, and any asbestos must be removed by a licensed asbestos removalist in accordance with the Health and Safety at Work (Asbestos) Regulations 2016. WorkSafe NZ provides detailed guidance on this requirement.

Will my demolition contractor organise the service disconnections for me?+

Many experienced demolition contractors will coordinate service disconnections as part of their project management, but this varies. Always confirm this in writing before signing a contract, and check that they are engaging properly licensed tradespeople for each type of restricted work.

Need a Demolition Contractor?

Find qualified demolition contractors near you in our directory.

Find a Demolition Contractor →

Demolition Contractors Near You

Canterbury Demolition AND Earthmoving Ltd logo

Demolition Contractor

4.8(17)

Christchurch, Canterbury

Canterbury Demolition and Earthmoving Ltd is a demolition contractor based in Christchurch, Canterbury. They provide demolition and excavation services for both residential and commercial buildings.

  • SiteWise
Morecroft logo

Demolition Contractor

Whangarei, Northland

Morecroft is New Zealand's largest provider of asbestos removal, hazardous materials management, asbestos testing, demolition and occupational hygiene services.

  • SiteWise
  • Tōtika Prequalified
  • ISO 45001
Alpha Demolition Ltd logo

Demolition Contractor

Auckland, Auckland

Alpha Demolition Ltd is a demolition contractor based in Auckland, specialising in building demolition, asbestos project management, asbestos removal, and dry ice blasting. They serve residential, commercial, and government clients across New Zealand.

Ambient Civil Ltd logo

Demolition Contractor

Auckland, Auckland

Civil Construction Auckland | Ambient Civil & Drainage NZ [ AC ] - Civil & Drainage 36 50 S - Auckland, NZ Local time --:-- Auckland's Civil Construction & Earthworks Experts Auckland Cover $5M insured Experience 20+ years Area Auckland-wide Compliance NZ H&S Get a free quote -> See our work Scroll Civil & Drainage Auckland NZ Free quotes / 24hr reply $5M Public Liability NZ H&S compliant 20+ years on the tools Privately owned Civil & Drainage Auckland NZ Free quotes / 24hr reply $5M Public...

  • SiteWise
Care Demolition Services logo

Demolition Contractor

Auckland, Auckland

CARE NZ - CARE ASBESTOS REMOVAL CARE NZ We are a -knit team of experienced asbestos professionals based in West Auckland, with 10 years of removal experience. We ve work for and alongside other removal groups over the years, and we ve practically seen it all. We have a range of professional contacts in various areas of both removal, testing, demolition and construction which allows us to tackle any problem. Our Supervisor s hold both Class A and B removal...

Central Demolition logo

Demolition Contractor

Feilding, Manawatū-Whanganui

Central Demolition provide specialist commercial and residential demolition and asbestos removal services throughout the North Island.

Last updated: Last reviewed:

The information on this page is provided as a general guide only. Kiwi Trade Directory makes no representations or warranties regarding the accuracy, completeness, or suitability of this information for your specific situation. Costs, timeframes, and recommendations vary significantly depending on your location, property, and individual circumstances. Always obtain multiple quotes from qualified tradespeople and seek independent professional advice before undertaking any home improvement or building work. Kiwi Trade Directory accepts no liability for any loss or damage arising from reliance on the information provided on this site.