Can I Pour My Own Concrete Deadman Anchors for a Retaining Wall?

Yes, in many cases you can pour your own concrete deadman anchors — but there are important NZ building consent rules and structural requirements to understand first.

Can I Pour My Own Concrete Deadman Anchors for a Retaining Wall?

Yes, pouring your own concrete deadman anchors is something many capable DIYers can tackle — but whether you're legally allowed to do it without a building consent, and whether your design will actually hold, depends on the height of your retaining wall and your site conditions. Get these details wrong and you could end up with a collapsed wall, a failed council inspection, or worse, a safety hazard.

What Is a Deadman Anchor?

A deadman anchor (sometimes called a deadman tie-back) is a buried concrete block or timber/steel element connected to a retaining wall by a tie rod or strap. It works by using the weight and friction of the surrounding soil to resist the horizontal pressure pushing against the wall. They're commonly used with timber sleeper walls, concrete block walls, and similar gravity-style retaining structures.

The deadman is typically poured in place — you dig a trench perpendicular to the wall, place your formwork or a simple timber box, run your tie rod or strap through, and pour concrete around it. Once cured, the backfill locks it in place.

Do You Need a Building Consent?

This is the most important question to answer before you lift a shovel. In New Zealand, retaining walls are covered by the NZ Building Code and consent requirements depend primarily on wall height and proximity to boundaries or structures.

Under Schedule 1 of the Building Act, retaining walls that retain up to 1.5 metres of ground and are not in a flood-prone area or near a boundary may be exempt from building consent — but this is not a blanket rule. Your local council has the final say, and some councils apply stricter thresholds.

Key rules of thumb (always confirm with your council):

  • Walls retaining less than 1.5 m: likely exempt, but check with your council
  • Walls retaining 1.5 m or more: almost certainly require a building consent and engineer-designed plans
  • Walls near boundaries, slopes, or surcharge loads (driveways, buildings): may require consent regardless of height

If your wall needs consent, your deadman anchor design will need to be specified by a Chartered Professional Engineer (CPEng) or similarly qualified structural engineer, and the work may need to be carried out or supervised by a Licensed Building Practitioner (LBP).

Designing Your Deadman Anchors

If your wall is within the exempt threshold and you're confident in your DIY skills, here's what good deadman design generally involves. Note that these are general principles — always base your actual design on your specific soil type, wall height, and loading conditions.

Sizing and Spacing

  • Deadmen are typically spaced 1.8 m to 2.4 m apart along the wall
  • The deadman block itself is usually at least 600 mm long and buried at a depth that puts it well behind the wall's failure plane (generally at least 1.5× the wall height back from the face)
  • Concrete strength of 17.5 MPa to 20 MPa is commonly used for deadman pours — a standard ready-mix or bagged concrete mix is usually adequate

Tie Rods and Straps

  • Galvanised steel tie rods, flat bar, or purpose-made geogrid straps connect the deadman to the wall
  • All metal components should be hot-dip galvanised or stainless steel to resist corrosion in NZ's often damp soils
  • Connections to the wall must be secure — bolted through sleepers or hooked around blocks, not just surface-fixed

Drainage

Poor drainage is the number-one cause of retaining wall failure in New Zealand. Always install agricultural drain coil (ag pipe) wrapped in geotextile fabric behind the wall, and ensure water has a clear path to exit. BRANZ has useful guidance on retaining wall drainage best practice.

Pouring the Concrete: Step by Step

  1. Dig your deadman trench perpendicular to the wall at the correct depth and distance
  2. Set your formwork — a simple timber box works well, or you can pour directly into a neat-sided trench in firm soil
  3. Thread your tie rod or strap through the form before pouring
  4. Mix or order your concrete — for small jobs, bagged concrete from Bunnings or Mitre 10 is fine; for larger pours, consider ordering ready-mix
  5. Pour and consolidate — rod or vibrate the concrete to remove air pockets
  6. Allow full cure time — at least 7 days before backfilling and loading, ideally 28 days for full strength
  7. Backfill in layers, compacting as you go to avoid point-loading the wall

When to Call a Professional

You should engage a qualified retaining wall builder or structural engineer if:

  • Your wall retains more than 1.5 m of ground
  • The wall is near a boundary, building, or driveway
  • Your site has poor or unstable soils (clay, fill, or sloping ground)
  • You're unsure about your design or the council requires consent
  • The wall will support a surcharge load such as a vehicle or structure

A professional can also help you avoid costly mistakes — a failed retaining wall can damage neighbouring properties and create significant legal liability. You can find qualified retaining wall builders in your area on tradedirectory.co.nz.

Safety Note

Excavation work carries real risks. Never work in an unsupported trench deeper than is safe, and follow WorkSafe NZ guidelines on when shoring or battering is required, and be aware of underground services before you dig. Check WorkSafe NZ guidelines on safe excavation practices.

Frequently Asked Questions

How far back from the wall should a deadman anchor be placed?+

As a general rule, deadman anchors should be placed at least 1.5 times the wall height back from the face of the wall, so they sit behind the soil's natural failure plane. However, the exact distance depends on your soil type and wall design — if in doubt, consult a structural engineer.

What concrete mix should I use for deadman anchors?+

A standard concrete mix of around 17.5–20 MPa is typically sufficient for deadman anchors. Bagged concrete mixes labelled for structural use from hardware stores like Bunnings or Mitre 10 are generally suitable for small DIY jobs. For larger pours, consider ordering ready-mix concrete from a local supplier.

Do I need a building consent to build a retaining wall with deadman anchors in NZ?+

It depends on the height and location of your wall. Retaining walls under 1.5 m that aren't near boundaries or structures may be exempt under Schedule 1 of the Building Act, but rules vary by council. Always check with your local council before starting work.

Can I use timber instead of concrete for deadman anchors?+

Yes, treated timber deadmen are commonly used, particularly with timber sleeper retaining walls. However, timber will eventually rot even if treated, so concrete deadmen generally offer greater longevity. If using timber, ensure it is rated H5 treatment or above for in-ground use in NZ.

How long should I wait before backfilling over freshly poured deadman anchors?+

You should wait a minimum of 7 days before backfilling and applying any load to freshly poured concrete deadmen. Waiting the full 28-day cure period before heavy loading is ideal. Backfill in compacted layers to avoid placing sudden point loads on the wall or tie connections.

Need a Retaining Wall Builder?

Find qualified retaining wall builders near you in our directory.

Find a Retaining Wall Builder →

Retaining Wall Builders Near You

Oncore Property Maintenance and Repairs logo

Retaining Wall Builder

Parnell, Auckland

Oncore Service New Zealand is the country's trusted specialist for residential and commercial maintenance, repairs, insurance work, and installations. From your initial consultation through project completion, we provide a single point of contact—no juggling multiple trades or stress . Whether it’s flood recovery, fire damage, heating upgrades, or Healthy Homes compliance, our local teams handle every detail on time and within budget.

Property maintenance services
Kennedy Contracting logo

Retaining Wall Builder

Christchurch, Canterbury

Christchurch Fencing Contractors and Decking - Kennedy Contracting Licensed Building Practitioner Christchurch’s Trusted Outdoor Construction & Property Improvement Experts Quality construction services for residential and commercial projects across Christchurch and Canterbury. From budget-friendly developments to high-end custom builds. Get Free Quote View Our Work Experienced Outdoor Construction & Landscaping Contractor Serving Christchurch Kennedy Contracting delivers quality...

  • Licensed Building Practitioner (LBP)
Build2 logo

Retaining Wall Builder

Auckland, Auckland

Based in Auckland North Shore Build2 Construction are experts at residential construction and concrete foundations. Contact Auckland's premier builders today

Buildingworks logo

Retaining Wall Builder

Whangarei, Northland

Whangarei region. Buildingworks provides a friendly, reliable, honest service for your residential and commercial building projects.

  • Licensed Building Practitioner (LBP)
Drainways logo

Retaining Wall Builder

Hastings, Hawke's Bay

Looking for reliable drain cleaning services in Hawke's Bay? Drainways offers professional civil drainage solutions. Contact us for a free quote today.

Concrete & Earth Queenstown logo

Retaining Wall Builder

Queenstown, Otago

Concrete & Masonry Stores Near You

Stock up for this job — concrete & masonry suppliers and stores, with address, phone and email.

THE Block Shop NZ Ltd logo

THE Block Shop NZ Ltd

Drury, Drury, Auckland

Concrete & Masonry

The Block Shop (TBS) is an independently owned manufacturer of masonry products in New Zealand. Our range includes kerbstone blocks and grass pavers, known for their insulating benefits, strength, and light weight due to premium local pumice. We supply distributors, builders, and block layers directly. Contact us for quality masonry solutions.

Concrete Pumping Equipment NZ Ltd logo

Concrete Pumping Equipment NZ Ltd

Wellington, Wellington

Concrete & Masonry

Supplying high-quality concrete pumping equipment, spare parts, and technical support across New Zealand. Trusted by contractors nationwide.

Concretec New Zealand Ltd logo

Concretec New Zealand Ltd

Rd 2, Pokeno, Waikato

Concrete & Masonry
Concrete Cowboy Ltd logo

Concrete Cowboy Ltd

Mount Roskill, Auckland, Auckland

Concrete & Masonry
Cemix Products Ltd logo

Cemix Products Ltd

Onehunga, Auckland, Auckland

Concrete & Masonry

We are a leading, independently owned manufacturer of drymix concrete and cement products for the building industry and DIY market in New Zealand

East Coast Concrete Ltd logo

East Coast Concrete Ltd

Awapuni, Gisborne, Gisborne

Concrete & Masonry

East Coast Concrete: Your Concrete Solutions Provider in Gisborne, New Zealand. Providing reliable and innovative concrete solutions for your projects.

Browse all concrete & masonry suppliers →
Last updated: Last reviewed:

The information on this page is provided as a general guide only. Kiwi Trade Directory makes no representations or warranties regarding the accuracy, completeness, or suitability of this information for your specific situation. Costs, timeframes, and recommendations vary significantly depending on your location, property, and individual circumstances. Always obtain multiple quotes from qualified tradespeople and seek independent professional advice before undertaking any home improvement or building work. Kiwi Trade Directory accepts no liability for any loss or damage arising from reliance on the information provided on this site.