DIY AnswersTiler

What Movement Joints Do I Need in a Tiled Floor?

Movement joints prevent cracked tiles and grout. Learn where to place them, what sizes to use, and when to call a professional tiler.

What Movement Joints Do I Need in a Tiled Floor?
Advertisement

Cracked tiles and blown grout joints are one of the most common tiling complaints in New Zealand homes — and a lack of proper movement joints is usually the culprit. Tiles and the substrates beneath them expand and contract at different rates due to temperature changes, moisture, and structural movement. Without somewhere for that movement to go, something has to give, and it's almost always the tile or grout that loses. Understanding where movement joints are needed, and how to install them correctly, can save you a costly retile down the track.

Why Movement Joints Matter

Tiles are rigid and bond tightly to their substrate. When the building moves — even slightly — stresses build up across the tiled surface. Movement joints (also called expansion joints or soft joints) are deliberately left ungrouted and filled with a flexible sealant, giving the assembly somewhere to breathe. BRANZ research consistently identifies missing or inadequate movement joints as a leading cause of tile failure in NZ buildings.

Advertisement

What the Standards Say

In New Zealand, tiling work is guided by NZS 4243 and the tile industry generally follows ISO 13007 for adhesives and grouts, along with manufacturer specifications. The MBIE Building Performance guidance and the NZ Building Code also set expectations around durability and weathertightness that movement joints directly support. While there is no single prescriptive NZ standard that covers every tiling scenario, the widely accepted industry benchmark — used by most professional tilers here — is based on the Tile Council of North America (TCNA) Handbook and European standard BS EN 14411, which recommend movement joints at specific intervals.

Where Movement Joints Are Required

As a general rule, movement joints should be placed:

  • At all changes of plane — where a floor meets a wall, a step riser meets a tread, or a floor meets a different floor material
  • At all structural joints — wherever there is a control joint, construction joint, or expansion joint in the concrete slab or substrate beneath
  • Around the perimeter of every tiled floor area, between the tiles and any fixed element (walls, columns, cabinetry, door frames)
  • Across large field areas — in the field of the tile, at regular intervals
  • Where different substrates meet — for example, where a concrete slab meets a timber framed floor
  • In heated floors — underfloor heating causes significant thermal movement and requires more frequent joints

Spacing in the Field

For interior floors, the general industry guideline is to install field movement joints at intervals of no more than 4–5 metres in each direction. In areas exposed to direct sunlight, temperature extremes, or underfloor heating, reduce this to around 2.5–3 metres. Outdoors or in unheated spaces like garages, joints should be even closer together.

Here's a quick reference:

LocationRecommended Maximum Spacing
Interior, climate-controlled~4–5 m each direction
Underfloor heating~2.5–3 m each direction
Exterior / unheated~2–3 m each direction
Perimeter (all areas)Always required
At substrate changesAlways required

These are general guidelines. Always follow your tile and adhesive manufacturer's specifications, which may be more conservative.

Advertisement

How Wide Should Movement Joints Be?

Perimeter and field movement joints are typically 6–10 mm wide for most residential floors. Larger format tiles (600 mm and above) and exterior applications generally need wider joints. The joint must be deep enough to allow the sealant to flex properly — a depth-to-width ratio of roughly 1:1 is ideal, and a foam backer rod is used to control depth before sealant is applied.

Choosing the Right Sealant

Movement joints must be filled with a flexible, paintable silicone or polyurethane sealant — never standard grout, which is rigid and will crack. Many tilers use colour-matched silicone so the joint blends with the surrounding grout. Sika and Ardex both offer sealant products suitable for tiled movement joints, and Mapei produces colour-coordinated silicone ranges designed to match their grout lines.

When selecting a sealant:

  • Choose mould-resistant formulas for wet areas (bathrooms, laundries)
  • Ensure it is rated for foot traffic if used on floors
  • Match the colour to your grout as closely as possible
  • Allow full cure time before use — check the product datasheet

Wet Areas and the NZ Building Code

In wet areas such as bathrooms and laundries, movement joints are especially critical. The NZ Building Code Clause E3 (Internal Moisture) requires that wet area linings prevent moisture penetration. A cracked grout line caused by missing movement joints can allow water behind tiles, leading to substrate damage, mould, and costly repairs. Always install a perimeter movement joint where floor tiles meet wall tiles or the base of a shower wall.

DIY or Professional?

Planning and installing movement joints correctly requires an understanding of the substrate, tile format, and site conditions. While a competent DIYer can install a perimeter silicone joint in a straightforward situation, field movement joints in large or complex areas are best left to a professional tiler who can assess the specific risks. Tiling over underfloor heating, large-format tiles, or structural slabs with existing control joints are all situations where professional advice is strongly recommended.

Tiling itself is not licensed restricted work in the same way as electrical or plumbing, but poor workmanship can void warranties and cause building code compliance issues. If your project involves plumbing penetrations, waterproofing membranes, or alterations to drainage, those elements must be carried out by a licensed tradesperson registered with the Plumbers Gasfitters & Drainlayers Board.

When to Call a Professional

Consider hiring a qualified tiler if:

  • Your floor area is larger than a small bathroom
  • You are tiling over underfloor heating
  • Large-format tiles (600 mm+) are being used
  • The substrate is a structural concrete slab with existing control joints
  • You are unsure where movement joints should go
  • Existing tiles have cracked and you need to diagnose the cause before retiling

A skilled local tiler will assess your specific substrate, tile selection, and conditions to design a movement joint layout that meets both manufacturer requirements and NZ Building Code expectations. You can find qualified tilers in your area at tradedirectory.co.nz.

Frequently Asked Questions

Can I use grout instead of silicone in a movement joint?+

No. Grout is rigid and will crack under movement. Movement joints must be filled with a flexible silicone or polyurethane sealant that can compress and expand with the building. Using grout in a movement joint defeats its purpose entirely.

Do I need movement joints in a small bathroom floor?+

Yes. Even in a small bathroom, you need a perimeter movement joint where the floor tiles meet the walls, shower base, or any fixed elements. This is especially important for waterproofing and to comply with NZ Building Code Clause E3 for internal moisture control.

How do I make movement joints less visible?+

Use a colour-matched silicone sealant that closely matches your grout colour. Brands like Mapei and Ardex offer silicone ranges designed to coordinate with their grout products. Placing perimeter joints in corners and along wall bases also makes them less noticeable.

My tiles have cracked — could missing movement joints be the cause?+

Quite possibly. Cracked tiles or grout, particularly in lines or near walls and doorways, are a classic sign of movement stress with nowhere to go. Before retiling, have a professional tiler assess the substrate and movement joint layout so the same problem doesn't recur.

Do I need more movement joints with underfloor heating?+

Yes. Underfloor heating causes repeated thermal expansion and contraction, which significantly increases stress on the tile assembly. Field movement joints should be spaced more closely — around 2.5 to 3 metres — and you should follow both the heating system manufacturer's and tile adhesive manufacturer's specific recommendations.

Need a Tiler?

Find qualified tilers near you in our directory.

Find a Tiler →

The information on this page is provided as a general guide only. tradedirectory.co.nz makes no representations or warranties regarding the accuracy, completeness, or suitability of this information for your specific situation. Costs, timeframes, and recommendations vary significantly depending on your location, property, and individual circumstances. Always obtain multiple quotes from qualified tradespeople and seek independent professional advice before undertaking any home improvement or building work. tradedirectory.co.nz accepts no liability for any loss or damage arising from reliance on the information provided on this site.